Bunji Dam Hydropower Project

The project is located on river Indus 83 KM east of Gilgit, headquarter of Northern Areas of Pakistan. AJoint Venture comprising three foreign and two local consulting engineers firms namely; MMI UK (Lead Firm), Nippon Koei Japan, Sogreah France, MM Pakistan and DMC Pakistan, provided consultancy services for the project during May, 2007 to Sept. 2010. These included feasibility study and preparation of detailed engineering designs, project cost estimates, PC-1 Proforma and tender documents. Some further geological and geo-technical investigations were undertaken following the submission of design report in September, 2010. Based on the results of these investigations, necessary design modifications were incorporated in the design report and the Assignment has been completed on 31st March, 2013.

The Salient Features of the project are as under:

Dam Height 190m
Dam Type Gravity RCC
Installed Capacity 7,100MW
Mean Annual Energy 24,088GWh
Gross Head 455m
Design Discharge1,900m³/sec
No & type of Turbines 20 No Francis Type
Head Race Tunnels 5 No.(7.8 Km long each)
Estimated Project Cost US$ 6.8 Billion
Estimated Cost of Transmission scheme for Dispersal of Power from Bunji Project to Major Load Centers in National Grid US$ 1.6 Billion
Construction Period of Project 09 Years