Naulong Dam Project

The dam is located on river Mulain district Jhal Maghsi of Balochistan. The objectives of the project include agriculture development, hydropower generation, flood mitigation and socio-economic uplift of the project area. A Joint Venture comprising PES (Lead Firm), BARQAAB and DMC provided consultancy services for review of feasibility study of the project and preparation of detailed engineering design, tender documents & drawings during 2009. DMC provided inputs in the areas of planning, design, hydraulics, hydrology, geology, environment and production potential of soils in the command area, preparation of drawings, cost estimates, BOQs and tender documents.


The salient features of the project as brought out by the study are as under:

Dam TypeZoned Earth Fill
Dam Height186 Ft
Crest Length2,999 Ft
Gross StorageCapacity 242,452 A. Ft.
Live Storage199,956 A. Ft.
Spillway Design Discharge467,507 Cusecs
Command Area94,000 Acres
Hydropower Generation4.4 MW
Ave. Annual Energy Generation 26.60 GWh.
Pak. Rs. 31.96 Billion Pak. Rs. 31.96 Billion

Home  |   The Company  |   Projects  |   Fields of Activities  |   Organiztion  |   Human Resources  |   Corporate Structure  |   Contact Us